Another productive round of effort to report on the Graf Spee. The rest of the main deck sections from the Pontos set were added but not without a little adventure along the way. The main deck is divided into three different sections and I started at the stern and worked my way forward to the bow. The stern section started out with the cut-outs accurately aligned but some of the holes for the secondary battery turrets and the king posts for the cranes were slightly off. I got them as close as possible and then used a round needle file to open up the holes further as needed through the wood so that everything can install properly later on.
The mid section went on without any major issues but did involve a lot more trimming around the outline for the main superstructure elements, so that took more careful work with the #11 blade to ensure I didn't accidentally cut too much or split some of the narrower sections away from each other. There's a slight gap where it doesn't match up with the stern deck section but that's not a real issue since that will be hidden away behind the AA gun platforms. I hadn't planned for those platform areas when I airbrushed the decks earlier, so a detail brush and some careful painting around the wood deck quickly corrected that problem.
The bow section was the smallest of the three and involved creating the necessary cutout for the breakwater. I used the kit part to help gauge where that needed to be and everything lined up just as it should. I'll wait to install the breakwater until I'm ready to add the anchor chains since they pass underneath it and the slight added height of the wood deck makes it challenging to feed the chain through the openings vs. place the chain and then install the breakwater over it.
Getting the full deck on definitely changes the look of things! Nothing like real wood to create a wood effect IMHO.
In the spirit of the ship-builders maxim of working from the 'bottom-up and inside-out', I turned to the main superstructure that the instructions deal with in Step 7. They must've had a consultant from IKEA helping out here as it's all 'flat-pack' panels that need to be cleaned up and assembled together to create the full structure. The Eduard set provided some added detail for the open bridge area and also some combat shutters for the larger windows. I also drilled out all the standard portholes with a #74 finger drill so they would match the detail level of the hull in that department. Putty filled in the notches for the kit ladders that will be replaced with Eduard PE items later on and I also used some white sheet styrene to blank off the molded opening left behind when I removed a molded-on access ladder on the forward bridge section.
I used liquid glue and the support outlines on the deck bases to add the different panels one at a time, leaving the forward section last so it could be matched up with the elevated bridge section correctly.
There's still more to be added to this superstructure module but it's together now as a solid foundation for more work to follow.