WIP 11-22-2015
Posted: Sat Oct 01, 2022 10:27 pm
Not a huge amount of bench time available today but did manage to make some additional progress. First up was the application of a pin wash to the mainmast tripod structure followed by a Lusterless Flat treatment so it will tie in with the rest of the ship.
While that was drying, I decided to tackle the yardarm rigging for the foremast. For this task, I used some EZ Line Fine Black elastic thread that I had on hand from my last rigging endeavor on the HMS Dreadnought.
Due to the delicate nature of the yardarm, I wanted to avoid placing too much tension on it so that concern was paramount throughout the process. I cut long lengths of the EZ Line and attached the end first to the yardarm so that they would hang loosely. A dot of CA applied with the tip of a toothpick to the arm itself combined with dipping the end of the EZ Line into some CA accelerator did the trick nicely. I attached only the innermost line first and used tweezers to gauge how long it needed to be and where it should attach on the 03 deck level. Then a small dot of CA was applied via toothpick to the deck and some accelerator brushed onto the loose end of the thread. Using tweezers, the end was positioned in the CA and held for a couple of seconds until it grabbed. Rinse and repeat and before long I had the 10 lines rigged and virtually no stress placed on the yardarm in the process. After the glue had thoroughly dried, I used a 10/0 detail brush to blend the ends of the lines back into the deck and yardarm as needed.
I'm very happy that it worked out as this is a prominent detail that would've been missing otherwise.
I'm still debating as to when I should run the remaining rigging lines between the two tripod masts and to the bow and stern. I'm thinking it might be best to hold off on doing that until after I get the rest of the guns along with the railings installed. That way I can keep stuff removable and decrease the likelihood of an unfortunate accident in the remaining stages.
While that was drying, I decided to tackle the yardarm rigging for the foremast. For this task, I used some EZ Line Fine Black elastic thread that I had on hand from my last rigging endeavor on the HMS Dreadnought.
Due to the delicate nature of the yardarm, I wanted to avoid placing too much tension on it so that concern was paramount throughout the process. I cut long lengths of the EZ Line and attached the end first to the yardarm so that they would hang loosely. A dot of CA applied with the tip of a toothpick to the arm itself combined with dipping the end of the EZ Line into some CA accelerator did the trick nicely. I attached only the innermost line first and used tweezers to gauge how long it needed to be and where it should attach on the 03 deck level. Then a small dot of CA was applied via toothpick to the deck and some accelerator brushed onto the loose end of the thread. Using tweezers, the end was positioned in the CA and held for a couple of seconds until it grabbed. Rinse and repeat and before long I had the 10 lines rigged and virtually no stress placed on the yardarm in the process. After the glue had thoroughly dried, I used a 10/0 detail brush to blend the ends of the lines back into the deck and yardarm as needed.
I'm very happy that it worked out as this is a prominent detail that would've been missing otherwise.
I'm still debating as to when I should run the remaining rigging lines between the two tripod masts and to the bow and stern. I'm thinking it might be best to hold off on doing that until after I get the rest of the guns along with the railings installed. That way I can keep stuff removable and decrease the likelihood of an unfortunate accident in the remaining stages.