Continuing on with the construction phases, I worked on Step 8 which deals with the propeller and hub assembly. The blades are separate from the two part hub and are nicely molded and the prop shaft has a notch that lines up with the opening inside the spinner cap. This, combined with how the base of the spinner and the tank that attaches to its back all line up mean that the prop can't rotate once everything is installed, so I had to decide how I wanted the prop to align first before committing to glue.
The little side notches on the tank behind the spinner align with tabs on the inside of the fuselage halves to keep everything lined up properly. Currently the prop and spinner are only dry fit together to make it a little easier to paint the prop later on before installing it permanently into the spinner.
Moving on to Step 9 which deals with the wings, I installed the radiator parts along with their covers/speed flaps. The radiators were painted with MM non-buffing Metalizer and the inside areas of the covers/flaps with MM RLM 02.
Since I wasn't fitting the under-wing gun pods, I skipped the optional parts that support that and added the upper wing halves. The fit here was very good, rather than use rubber bands I opted for smooth jaw clamps placed at strategic points to ensure the glue set evenly with both halves.
While that was setting up, I assembled the two-part elements for the flaps and ailerons and cleaned up the leading-edge slats. In order to position the flaps at the correct dropped angle, I removed the little mount tabs they had on their front edges and carefully glued them into position with liquid glue and used a metal ruler to gauge the correct angle/gap on both sides so they matched up with each other. Ailerons and slats were installed as well to complete the wing assembly.
Step 10 pulls the fuselage together but I'm not quite ready for that, but I did start work on the front nose panel by drilling open the mount holes for the support posts for the air filter and installed the air intake mount as well. The intake is in two halves so careful gluing with liquid glue and a bit of sanding were needed to give it a seamless look.
Last but not least for the day, I assembled the two-part components for the rudder and the horizontal stabilizers as called for in Step 11. The elevators were cleaned up and installed in the level position as well.
Next up will be finishing off some of the remaining construction odds and ends and prepping for painting on the interior before the fuselage gets joined up.