With the masts installed yesterday, the way was cleared for me to add the rigging required. I started with the foremast and added all of its lines with the exception of the bracing lines that connect to the bow since I didn't want them to be in the way when I work on the rest of the details still to come. EZ Line, CA, and accelerator plus enduring the full day working without the fan running (airflow makes it really hard to handle the superfine EZ line thread!) made for a successful effort. I'm really glad I held off adding the bridge deck railings as that would've made for some really tight spaces if I hadn't.
The mainmast also got its dose of rigging as well. I almost painted myself into a corner by adding all of the signal flag lines before I added the aft railing for the walkway section. Fortunately, I had just enough room to fit it in around the lines without disturbing them but it was a close call. Learning my lesson, I shaped the boat deck level railings first and checked their fit and placement before I added the bracing stays and lines for the sail boom. Once I was sure I had the necessary room and clearance, I added those lines, installed the railings, and added the access ladders down to the main deck level.
It's worth noting that the instructions include a rigging diagram and it's helpful up to a point...but there were a couple of cases where the rigging they were calling out just wasn't physically possible, so I used a little creative license in a couple of spots to get things as close as I could given the spaces available.
Next up will be tackling the ship's boats so I can populate the racks now that I don't need access to those areas any longer.